Redesign and installations
Replaced the existing power cables for all electrical motors and limit switches.
New cable conduit and penetrations
Renew the steel cable conduit, steel pipes and penetretion.
1000
Hours of Work
Juli 2019
Construction Date
3820ft
Surface Area
Reconect Electric Panels and final TEST
Reconect all the cables in to the electric panels and test al the liveboats motors and limit switches.