Design and installations
Replace existing control panels for 9 Pulper control panel stations and 3 process tanks
Total overhaul PLC and control system for each Pulper Station,
Reprogram/convert existing main PLC system for ship to have spare as the old PLC is obsolete
789
Hours of Work
Juli 2015
Construction Date
3820ft
Surface Area
1.800.000$
Budget
Replacing operation stations
Replace each operation station, pressure switched and food grinding motor for the system to work properly.